Press Release

Nippon Express (Malaysia) completes construction of Shah Alam Logistics Center

Designed to meet a diversity of logistics needs for halal, pharmaceutical and other products

Nippon Express (Malaysia) Sdn. Bhd. (Akiya Hayase, President), a local subsidiary of Nippon Express Co., Ltd. (Mitsuru Saito, President), has completed construction of the Shah Alam Logistics Center, the Nippon Express Group's most extensive single-structure multifunctional logistics warehouse outside Japan, in the Shah Alam Industrial Park in the Malaysian state of Selangor, and the Center will begin operations from Monday, March 9.

A rise in Malaysia's national income has driven remarkable growth in personal consumption, and the increased distribution of consumer goods has led to expectations of growing needs for more sophisticated domestic logistics and warehousing services.

The Shah Alam Industrial Park that hosts this newly opened Center is located near the capital city of Kuala Lumpur, Malaysia's largest consumption area, and very favorably situated as a logistics hub, with easy access to Malaysia's main sea gateway Port Klang and to Kuala Lumpur International Airport.

[Features of the Shah Alam Logistics Center]

Nippon Express (Malaysia) will employ this Center to further bolster its logistics functions and thereby meet the increasingly diverse and sophisticated logistics needs of customers, including domestic sales logistics for consumer goods, manufacturing logistics (JIT delivery), temperature-controlled storage using air-conditioned facilities, and storage/delivery of halal products.

[Profile of new facility]

Name Nippon Express (Malaysia) Sdn. Bhd. Shah Alam Logistics Center
Address Lot 72, Persiaran Jubli Perak, Seksyen 22, 40300 Shah Alam, Selangor Darul Ehsan, Malaysia
Structure Two-story reinforced concrete structure
Lot area 59,183m2
Total floor area 63,421m2
(Breakdown)
Warehouse area: 49,879m2 (including an 8,560m2 air-conditioned facility)
Office: 3,903m2
Eaves area, etc.:9,639m2
Principal equipment Raised-floor platform, 1st/2nd floor truck berths (rampway approach), 24-hour security, full CCTV coverage, emergency power generator, dust-resistant flooring
Start of operations Monday, March 9, 2020